USAPhO Guide

F=ma/Work, Energy & Momentum

Work & the Work-Energy Theorem

Computing work along a path, including curved ones, and connecting it straight to the change in kinetic energy.

Very frequent on exams35 min read30 problems

The question forces alone make painful

A block is launched up a rough ramp at 8.0 m/s8.0\ \mathrm{m/s} and you want to know how far it gets before it stops. You can do this with F=maF = ma: find the acceleration, then use a kinematic equation. Now curve the ramp so the slope changes as the block climbs. The acceleration is no longer constant, the kinematic equations die, and the honest route is a differential equation.

But something has not changed. The block started with a certain amount of motion and ended with none, and gravity and friction were what drained it. If you can keep an account of how much each force takes out of that stock of motion, you get the answer without ever knowing the acceleration at any instant. That account is called work, the stock of motion is called kinetic energy, and the rule connecting them is the last general-purpose tool you need before conservation of energy becomes available in the next lesson.

Orbits in the previous lesson were a case where speed and radius traded off in a way F=maF = ma described but never made obvious. Work is the language in which that trade is bookkeeping.

Only the part of the force along the motion counts

Push a crate 4.0 m4.0\ \mathrm{m} across the floor with a steady 25 N25\ \mathrm{N} in the direction it moves, and you have done 25×4.0=100 J25 \times 4.0 = 100\ \mathrm{J} of work. One joule is one newton-metre. That is the whole definition when the force and the motion point the same way.

Now tilt your push. A child drags a sled with a rope at 30∘30^\circ above the horizontal. The rope pulls partly forward and partly upward, and the sled only goes forward. The upward part of the pull is not lifting the sled anywhere: it just presses less weight onto the ground. Only the forward part of the tension travels with the sled, so only that part does work. Split the 40 N40\ \mathrm{N} tension into a forward piece 40cos⁡30∘40\cos 30^\circ and an upward piece 40sin⁡30∘40\sin 30^\circ, and keep the forward one:

W=Fdcos⁡θW = Fd\cos\theta

where FF is the size of the force, dd the distance moved, and θ\theta the angle between them. For the sled, W=40×6.0×cos⁡30∘W = 40 \times 6.0 \times \cos 30^\circ. In vector language this is the dot product, W=F⃗⋅d⃗W = \vec F \cdot \vec d, which is the machine that picks out "the part of one vector along another".

Three consequences fall straight out of the cosine. At θ=0\theta = 0 you get W=FdW = Fd, the most work a force of that size can do. At θ=90∘\theta = 90^\circ, cos⁡θ=0\cos\theta = 0 and the work is exactly zero: a normal force on a sliding block, the tension in a string swinging a ball in a circle, the track pressing sideways on a bead. These forces steer without feeding. And past 90∘90^\circ the cosine goes negative. Friction on a sliding block points backwards, so θ=180∘\theta = 180^\circ, cos⁡θ=−1\cos\theta = -1, and the work is −fd-f d. Negative work is a real answer, not a mistake: it means the force removed motion instead of supplying it.

Figure 1. The rope's pull splits into a forward piece that does work and an upward piece that does none. Drag the angle to 90 degrees and watch the work fall to zero even though you are pulling just as hard.
Worth remembering

A force perpendicular to the motion does no work at any instant, no matter how strong it is. That single fact removes normal forces, string tensions on circular paths, and magnetic forces from most energy accounts before you start calculating.

There is a bonus hiding in W=F⃗⋅d⃗W = \vec F \cdot \vec d. If the force is constant, only the straight-line displacement from start to finish matters, not the path. A bead is dragged along a quarter circle of radius 1.5 m1.5\ \mathrm{m} from (1.5,0)(1.5, 0) to (0,1.5)(0, 1.5) while a constant F⃗=(10 N)x^\vec F = (10\ \mathrm{N})\hat x acts. The path is curved, but the net displacement is Δx=0−1.5=−1.5 m\Delta x = 0 - 1.5 = -1.5\ \mathrm{m} and Δy=+1.5 m\Delta y = +1.5\ \mathrm{m}. Only Δx\Delta x pairs with a force along x^\hat x, so W=(10)(−1.5)=−15 JW = (10)(-1.5) = -15\ \mathrm{J}. You never had to follow the arc.

Quick check

A satellite moves in a perfectly circular orbit. How much work does gravity do over one full orbit?

Pick one option first.

When the force changes with position

W=Fdcos⁡θW = Fd\cos\theta assumes FF is the same the whole way. Springs, gravity far from a planet, and a friction coefficient that worsens along a track all break that. The repair is the standard one: chop the motion into steps so short that the force is effectively constant across each, multiply force by step, and add.

W=∫ABF⃗⋅dr⃗W = \int_{A}^{B} \vec F \cdot d\vec r

If you have not met an integral, read the symbol as "the area under the curve of FF against xx". That is not a metaphor: it is what the sum of (height)×(width)(\text{height}) \times (\text{width}) strips converges to. Area under an FF versus xx graph is work, and area below the axis counts as negative.

Two shapes cover most problems. A force growing linearly, F=6xF = 6x, from x=0x = 0 to x=3.0 mx = 3.0\ \mathrm{m} traces a triangle of base 3.03.0 and height 6×3.0=18 N6 \times 3.0 = 18\ \mathrm{N}, so the work is 12(3.0)(18)=27 J\tfrac12 (3.0)(18) = 27\ \mathrm{J}. A force dying away linearly, F=12−2xF = 12 - 2x from x=0x=0 to x=5.0 mx = 5.0\ \mathrm{m}, runs from 12 N12\ \mathrm{N} down to 2 N2\ \mathrm{N}: a trapezoid, whose area is the average height times the width, 12+22×5.0=35 J\tfrac{12+2}{2} \times 5.0 = 35\ \mathrm{J}.

For curved force laws you need one calculus fact, the power rule for areas: the area under xnx^n from 00 to bb is bn+1/(n+1)b^{n+1}/(n+1). So F=3x2F = 3x^2 from 00 to 2.0 m2.0\ \mathrm{m} does 3×2.03/3=8.0 J3 \times 2.0^3/3 = 8.0\ \mathrm{J}. The same rule with n=−2n = -2 handles inverse-square forces, where the antiderivative of 1/x21/x^2 is −1/x-1/x. Take a force of magnitude 50/x250/x^2 pulling a probe back toward the origin, so the force component along +x+x is −50/x2-50/x^2. Moving out from x=1.0 mx = 1.0\ \mathrm{m} to x=5.0 mx = 5.0\ \mathrm{m}:

W=∫15(−50x2)dx=[50x]15=505−501=10−50=−40 JW = \int_{1}^{5} \left(-\frac{50}{x^2}\right)dx = \left[\frac{50}{x}\right]_{1}^{5} = \frac{50}{5} - \frac{50}{1} = 10 - 50 = -40\ \mathrm{J}

Negative, as it must be: the probe moved away from something pulling it back.

Figure 2. Work as signed area. Change the intercept and the slope to build different force laws, and slide the finish line out. Push the slope negative until part of the shaded region drops below the axis and watch the total work stop growing.
Where this goes wrong

When a force reverses sign partway along the path, do not take the area of the whole shape and call it done. Split at the crossing point, and subtract the part below the axis instead of adding it. A sketch of FF against xx before you integrate costs ten seconds and catches this every time.

Net work is the change in kinetic energy

Here is why any of this is worth tracking. Start from Fnet=maF_{\text{net}} = ma for motion along a line and compute the work done by the net force:

Wnet=∫Fnet dx=∫mdvdt dxW_{\text{net}} = \int F_{\text{net}}\,dx = \int m\frac{dv}{dt}\,dx

Now use a trick worth keeping. Since dx/dt=vdx/dt = v, you can write dx=v dtdx = v\,dt, and the dtdt cancels:

∫mdvdtv dt=∫vivfmv dv\int m\frac{dv}{dt}v\,dt = \int_{v_i}^{v_f} mv\,dv

The variable is now vv instead of xx, and that last area (a triangle under the line mvmv) is 12mvf2−12mvi2\tfrac12 mv_f^2 - \tfrac12 mv_i^2. Define the kinetic energy K=12mv2K = \tfrac12 mv^2 and you have the work-energy theorem:

Wnet=ΔK=12mvf2−12mvi2W_{\text{net}} = \Delta K = \tfrac12 mv_f^2 - \tfrac12 mv_i^2

Read it in words: add up the work done by every force acting on an object, and the total equals the change in its 12mv2\tfrac12 mv^2. Speed up and the net work was positive. Slow down and it was negative. Move at constant speed, even around a corner, and the net work was zero.

Notice what is absent. There is no time in that equation, and no acceleration. That is the whole reason to use it. A 1200 kg1200\ \mathrm{kg} car at 20 m/s20\ \mathrm{m/s} comes to a stop; the brakes did 0−12(1200)(20)2=−240,000 J0 - \tfrac12(1200)(20)^2 = -240{,}000\ \mathrm{J} of work, and you do not need to know whether it took two seconds or ten.

Where this goes wrong

Do not compute WnetW_{\text{net}} from the net force and then add the individual works on top of it. Pick one route: either sum the forces as vectors and dot the result with the displacement, or work out each force's contribution separately and add the numbers. Doing both double counts, and the symptom is an answer exactly twice too big.

Quick check

A worker lifts a 12 kg bucket 8.0 m up a well at constant speed. What is the net work done on the bucket?

Pick one option first.

Three worked examples

One: a sled with two forces acting. A 25 kg25\ \mathrm{kg} sled starts from rest on level ground. A rope pulls with 90 N90\ \mathrm{N} at 25∘25^\circ above the horizontal for 12 m12\ \mathrm{m}, and the coefficient of kinetic friction is 0.150.15. Find the final speed.

On blank paper, write down every force first: tension, gravity, normal, friction. Gravity and the normal force are both perpendicular to the motion, so they do no work and you can drop them from the energy account, but you still need the normal force's size, because friction depends on it.

Vertically the sled does not accelerate, so N=mg−Tsin⁡25∘=(25)(9.8)−90(0.4226)=245−38.0=207.0 NN = mg - T\sin 25^\circ = (25)(9.8) - 90(0.4226) = 245 - 38.0 = 207.0\ \mathrm{N}. That upward tug of the rope matters: friction is f=μkN=0.15×207.0=31.05 Nf = \mu_k N = 0.15 \times 207.0 = 31.05\ \mathrm{N}.

Work by the rope: WT=(90)(12)cos⁡25∘=(90)(12)(0.9063)=978.8 JW_T = (90)(12)\cos 25^\circ = (90)(12)(0.9063) = 978.8\ \mathrm{J}. Work by friction: Wf=−(31.05)(12)=−372.6 JW_f = -(31.05)(12) = -372.6\ \mathrm{J}. Net work =978.8−372.6=606.2 J= 978.8 - 372.6 = 606.2\ \mathrm{J}.

The sled started at rest, so 12mvf2=606.2\tfrac12 mv_f^2 = 606.2, giving vf2=2(606.2)/25=48.5v_f^2 = 2(606.2)/25 = 48.5 and vf=6.96 m/sv_f = 6.96\ \mathrm{m/s}.

Two: a force that varies, ending in a speed. A 2.0 kg2.0\ \mathrm{kg} cart at rest is pushed along the xx-axis by F=4x2F = 4x^2 newtons, with xx in metres, from x=0x = 0 to x=3.0 mx = 3.0\ \mathrm{m}. Find the final speed.

You cannot use FdFd, because FF runs from 00 to 4(3.0)2=36 N4(3.0)^2 = 36\ \mathrm{N}. Take the area instead. With n=2n = 2, the area under 4x24x^2 from 00 to 3.03.0 is 4×3.03/3=4×27/3=36 J4 \times 3.0^3/3 = 4 \times 27/3 = 36\ \mathrm{J}.

Then 12(2.0)vf2=36\tfrac12(2.0)v_f^2 = 36, so vf2=36v_f^2 = 36 and vf=6.0 m/sv_f = 6.0\ \mathrm{m/s}.

A close cousin: if friction itself varies with position, say μ=0.050x\mu = 0.050x, the friction force is μmg=0.050x mg\mu mg = 0.050x\,mg, which grows linearly, and its work over a distance dd is the triangle −12(0.050d mg)(d)-\tfrac12 (0.050 d\, mg)(d). Setting that equal to −12mvi2-\tfrac12 mv_i^2 makes the mass cancel and leaves 0.050 g d2=vi20.050\,g\,d^2 = v_i^2. That is a one-line answer to a problem that would be a nightmare with F=maF = ma.

Three: reeling up a hanging rope. A uniform chain of mass 3.0 kg3.0\ \mathrm{kg} and length 2.0 m2.0\ \mathrm{m} hangs from a hook. How much work does it take to pull all of it up onto the hook?

The trap is to reach for mghmgh and not know what to use for hh. Different pieces of the chain have to be lifted different distances: the top link barely moves, the bottom link travels the full 2.0 m2.0\ \mathrm{m}. So slice it.

Let yy be the depth of a slice below the hook. The chain has mass per unit length λ=m/L=3.0/2.0=1.5 kg/m\lambda = m/L = 3.0/2.0 = 1.5\ \mathrm{kg/m}, so a slice of thickness dydy has mass λ dy\lambda\,dy and must be raised by yy. Its share of the work is (λ dy)gy(\lambda\,dy)gy. Adding over yy from 00 to LL is the area under a line again:

W=λg∫0Ly dy=λgL22=mgL2W = \lambda g \int_0^L y\,dy = \lambda g \frac{L^2}{2} = \frac{mgL}{2}

Numerically, W=(3.0)(9.8)(2.0)/2=29.4 JW = (3.0)(9.8)(2.0)/2 = 29.4\ \mathrm{J}.

Look at what mgL/2mgL/2 says: it is the whole weight lifted through L/2L/2, the distance the chain's centre of mass rises. That shortcut is general. For any rigid or floppy collection of pieces, the work gravity takes is mg×(rise of the centre of mass)mg \times (\text{rise of the centre of mass}).

Chains, ropes, and things that move different distances

The centre-of-mass shortcut earns its keep whenever only part of an object moves. Suppose a length ℓ\ell of a chain lying on a table hangs over the edge, with mass per unit length λ\lambda. The part on the table is already at table height and does not need lifting. The hanging part has mass λℓ\lambda \ell and its centre of mass sits ℓ/2\ell/2 below the edge, so pulling it all back up costs

W=(λℓ)gℓ2=λgℓ22W = (\lambda \ell) g \frac{\ell}{2} = \frac{\lambda g \ell^2}{2}

Run the same accounting backwards and you get the falling case. Release a chain that is partly over the edge and let it slide off a frictionless table. Gravity does positive work equal to the weight times the drop of the centre of mass between the two configurations, and by the work-energy theorem that equals 12mv2\tfrac12 mv^2 for the whole chain, which all moves at the same speed because it is inextensible. Find both centre-of-mass positions, subtract, multiply by mgmg, and solve for vv. The only real work is being careful about where each centre of mass is.

Quick check

Two identical ropes are lifted onto a hook. Rope A is twice as long and twice as heavy as rope B. How does the work for A compare with the work for B?

Pick one option first.

Power, and one place it saves you

Work per unit time is power, measured in watts. Differentiate W=F⃗⋅d⃗W = \vec F \cdot \vec d with respect to time and the displacement turns into velocity:

P=dWdt=F⃗⋅v⃗=Fvcos⁡θP = \frac{dW}{dt} = \vec F \cdot \vec v = Fv\cos\theta

The same "component along" idea, one derivative up. It is also the cleanest way to handle rope constraints. If a rope runs from a cart over a smooth pole, the speed at which the free end is reeled in equals the component of the cart's velocity along the rope, because that component is the rate at which the cart-to-pole distance shrinks.

So: a cart on a level track is pulled by a rope over a pole 4.0 m4.0\ \mathrm{m} up, and the rope is hauled in at 3.0 m/s3.0\ \mathrm{m/s}. When the cart is 3.0 m3.0\ \mathrm{m} from the base of the pole, the rope's length to the cart is 3.02+4.02=5.0 m\sqrt{3.0^2 + 4.0^2} = 5.0\ \mathrm{m}, and the rope makes an angle with the track whose cosine is 3.0/5.0=0.63.0/5.0 = 0.6. The cart's speed vv satisfies vcos⁡θ=3.0v\cos\theta = 3.0, so v=3.0/0.6=5.0 m/sv = 3.0/0.6 = 5.0\ \mathrm{m/s}. The cart moves faster than the rope is pulled, and it does so because only part of its velocity shortens the rope.

Figure 3. A block launched up a rough incline, with its kinetic energy draining into gravity and friction. Raise the friction coefficient and watch the stopping distance collapse; set it to zero and the block comes back with the speed it left with.

How to recognise a work-energy problem

Look for these signals in the problem statement.

Speeds and distances, but no times. "Launched at 8.0 m/s8.0\ \mathrm{m/s}, how far does it go?" or "how fast is it moving after 5 m5\ \mathrm{m}?" There is no clock in the question, so use the tool with no clock in it.

A force given as a function of position. F=6xF = 6x, F=200/x2F = 200/x^2, μ=0.050x\mu = 0.050x. The moment a force depends on xx rather than tt, integrating over xx is natural and integrating over tt is not.

A curved or awkward path with a question only about the endpoints. If you are asked for the speed at the bottom of a ramp of unspecified shape, nobody wants you tracking the direction of motion. Add up the work.

Something that moves in pieces, like a chain or a rope, where "the distance moved" is different for different parts. Slice it, or use the centre of mass.

Reach for F=maF = ma instead when the question asks when something happens, or asks for a force, or for an acceleration at a specific instant. Work-energy throws away the timeline in exchange for a scalar equation, which is a very good trade right up until the timeline is what you were asked about.

One limitation to carry forward. In every example here you had to compute the work by each force explicitly, and for gravity and springs that computation turned out to depend only on the start and end points. Forces with that property let you skip the integral entirely by storing the answer in advance, which is what potential energy is.

Problems

Work these on paper, then check your answer here.

1.

Pushing a crate across a floor

EasyWritten for this guidework

A worker pushes a crate with a constant horizontal force of 25 N25\ \mathrm{N} and the crate slides 4.0 m4.0\ \mathrm{m} in the direction of the force. How much work does the worker do, in J?

J
2.

Rope at an angle

EasyWritten for this guideworkangle

A child drags a sled 6.0 m6.0\ \mathrm{m} along level ground using a rope that makes 30∘30^\circ with the horizontal. The tension is 40 N40\ \mathrm{N}. How much work does the rope do, in J?

J
3.

Work done by friction

EasyWritten for this guideworkfriction

A 20 kg20\ \mathrm{kg} box slides 5.0 m5.0\ \mathrm{m} across a level floor with coefficient of kinetic friction μk=0.30\mu_k = 0.30. How much work does friction do on the box, in J? (Give the signed value.)

J
4.

Cart started from rest

EasyWritten for this guidework-energy theorem

A 2.0 kg2.0\ \mathrm{kg} cart starts at rest on a frictionless track. A total of 50 J50\ \mathrm{J} of work is done on it. What is its final speed, in m/s?

m/s
5.

Braking car

EasyWritten for this guidework-energy theorem

A 1200 kg1200\ \mathrm{kg} car traveling at 20 m/s20\ \mathrm{m/s} comes to a complete stop. How much work do the brakes do on the car, in J? (Give the signed value.)

J
6.

Lifting a bucket

EasyWritten for this guideworkgravity

A worker raises a 12 kg12\ \mathrm{kg} bucket 8.0 m8.0\ \mathrm{m} up a well at constant speed. How much work does the worker do on the bucket, in J?

J
7.

Work by gravity on a falling ball

EasyWritten for this guideworkgravity

A 0.50 kg0.50\ \mathrm{kg} ball falls 3.0 m3.0\ \mathrm{m}. How much work does gravity do on it, in J?

J
8.

Sliding up a ramp

EasyWritten for this guideworkincline

A 4.0 kg4.0\ \mathrm{kg} block is pushed 3.0 m3.0\ \mathrm{m} up a 30∘30^\circ incline. How much work does gravity do on the block, in J? (Give the signed value.)

J
9.

Speeding up a puck

EasyWritten for this guidework-energy theorem

A 3.0 kg3.0\ \mathrm{kg} puck speeds up from 4.0 m/s4.0\ \mathrm{m/s} to 10 m/s10\ \mathrm{m/s}. What is the net work done on it, in J?

J
10.

Force opposing motion

EasyWritten for this guidework

A 15 N15\ \mathrm{N} force acts on a cart directly opposite to its motion while the cart moves 8.0 m8.0\ \mathrm{m}. How much work does this force do, in J?

J
11.

Area under a force graph★

NormalWritten for this guidevariable force

A force acting along the xx-axis grows linearly as F=6xF = 6x (newtons, with xx in meters). How much work does it do as an object moves from x=0x=0 to x=3.0 mx=3.0\ \mathrm{m}, in J?

J
12.

Force that dies away

NormalWritten for this guidevariable force

A cart is pushed along the xx-axis by F=12−2xF = 12 - 2x (newtons, xx in meters). How much work is done from x=0x=0 to x=5.0 mx=5.0\ \mathrm{m}, in J?

J
13.

Cubic force law

NormalWritten for this guidevariable forceintegration

A spring-like device exerts F=3x2F = 3x^2 (newtons, xx in meters) along the direction of motion. How much work does it do from x=0x=0 to x=2.0 mx=2.0\ \mathrm{m}, in J?

J
14.

Sled with friction and an angled rope★

NormalWritten for this guidework-energy theoremfriction

A 30 kg30\ \mathrm{kg} sled on level ground is pulled 10 m10\ \mathrm{m} from rest by a rope with tension 80 N80\ \mathrm{N} directed 20∘20^\circ above the horizontal. The coefficient of kinetic friction is 0.100.10. What is the sled's final speed, in m/s?

m/s
15.

Down a rough incline

NormalWritten for this guidework-energy theoremincline

A 2.0 kg2.0\ \mathrm{kg} block slides from rest 4.0 m4.0\ \mathrm{m} down a 37∘37^\circ incline with μk=0.20\mu_k = 0.20. What is its speed at the bottom, in m/s?

m/s
16.

Compressing a spring

NormalWritten for this guidespringwork

A spring with stiffness k=400 N/mk = 400\ \mathrm{N/m} is compressed 0.15 m0.15\ \mathrm{m} from its natural length. How much work does the person doing the compressing perform, in J?

J
17.

Stopping distance

NormalWritten for this guidework-energy theoremfriction

A 0.40 kg0.40\ \mathrm{kg} hockey puck sliding at 12 m/s12\ \mathrm{m/s} is brought to rest by friction with μk=0.10\mu_k = 0.10. How far does it travel, in m?

m
18.

Constant-speed haul up a ramp

NormalWritten for this guideworkinclinefriction

A 50 kg50\ \mathrm{kg} crate is pulled 8.0 m8.0\ \mathrm{m} up a 25∘25^\circ ramp at constant speed, with μk=0.15\mu_k = 0.15 between crate and ramp. How much work does the pulling force (directed up the ramp) do, in J?

J
19.

Elevator cable

NormalWritten for this guideworktension

An elevator of mass 800 kg800\ \mathrm{kg} accelerates upward at 1.5 m/s21.5\ \mathrm{m/s^2} through a height of 10 m10\ \mathrm{m}. How much work does the cable tension do, in J?

J
20.

Bullet in a board

NormalWritten for this guidework-energy theoremaverage force

A 10 g10\ \mathrm{g} bullet moving at 400 m/s400\ \mathrm{m/s} buries itself 6.0 cm6.0\ \mathrm{cm} into a wooden block that is held fixed. What is the average stopping force, in N?

N
21.

Two forces on a box

NormalWritten for this guidework-energy theorem

A 5.0 kg5.0\ \mathrm{kg} box on frictionless ice is acted on by a 30 N30\ \mathrm{N} force pointing east and a 12 N12\ \mathrm{N} force pointing west. Starting from rest, what is its kinetic energy after moving 7.0 m7.0\ \mathrm{m} east, in J?

J
22.

Friction on a curved track

NormalWritten for this guideworkfrictionpath

A block is dragged around a quarter-circle groove of radius 2.0 m2.0\ \mathrm{m} on a horizontal table. A constant friction force of 9.0 N9.0\ \mathrm{N} acts opposite the motion everywhere along the path. How much work does friction do, in J? (Give the signed value.)

J
23.

Chain hanging off a table★

HardWritten for this guideworkintegrationcenter of mass

A uniform chain of mass 4.0 kg4.0\ \mathrm{kg} and length 2.0 m2.0\ \mathrm{m} lies on a frictionless table with 0.50 m0.50\ \mathrm{m} of it hanging over the edge. How much work must be done to pull the hanging part back onto the table, in J?

J
24.

Lifting a heavy rope

HardWritten for this guideworkintegration

A uniform rope of mass 6.0 kg6.0\ \mathrm{kg} and length 3.0 m3.0\ \mathrm{m} hangs from a hook. How much work is needed to reel the whole rope up onto the hook, in J?

J
25.

Inverse-square force

HardWritten for this guidevariable forceintegration

A probe moves along the xx-axis under an attractive force of magnitude F=200/x2F = 200/x^2 (newtons, xx in meters), directed toward the origin. How much work does this force do as the probe moves from x=2.0 mx = 2.0\ \mathrm{m} to x=10 mx = 10\ \mathrm{m}, in J? (Give the signed value.)

J
26.

Position-dependent friction

HardWritten for this guidevariable forcefriction

A block slides along a track where the coefficient of friction increases with position as μ=0.050 x\mu = 0.050\,x (xx in meters). The block has mass 2.0 kg2.0\ \mathrm{kg} and enters at x=0x = 0 with speed 6.0 m/s6.0\ \mathrm{m/s}. At what value of xx does it stop, in m?

m
27.

Force along a circular arc

HardWritten for this guideworkvector

A bead is guided along a circular arc of radius 1.5 m1.5\ \mathrm{m} in the xyxy-plane, from the point (1.5,0)(1.5, 0) to (0,1.5)(0, 1.5), while a constant force F⃗=(10 N)x^\vec F = (10\ \mathrm{N})\hat x acts on it. How much work does F⃗\vec F do, in J? (Give the signed value.)

J
28.

How far up the ramp?

HardWritten for this guidework-energy theoreminclinefriction

A block is launched up a 30∘30^\circ incline at 8.0 m/s8.0\ \mathrm{m/s}; the coefficient of kinetic friction is 0.250.25. How far along the incline does it travel before stopping, in m?

m
29.

Pulling a cart with a rope over a pole★

Very HardWritten for this guideworkgeometry

A cart on a frictionless track is pulled by a rope that passes over a smooth pole a height h=3.0 mh = 3.0\ \mathrm{m} above the track. Someone pulls the free end of the rope in at a constant 2.0 m/s2.0\ \mathrm{m/s}. When the cart is 4.0 m4.0\ \mathrm{m} horizontally from the base of the pole, what is the cart's speed, in m/s?

m/s
30.

Chain sliding off a frictionless table

Very HardWritten for this guideworkintegrationchain

A uniform chain of length L=2.0 mL = 2.0\ \mathrm{m} rests on a frictionless table with a length 0.40 m0.40\ \mathrm{m} hanging over the edge. It is released and slides off. What is the speed of the chain at the instant the last link leaves the table, in m/s?

m/s